§ 07 · ROLLOUT
From point list to acceptance,
in five steps.
- STEP 01
Site survey and point list
Inventory the equipment, controller models and communication interfaces, then compile the point list — what is status, what is a value, what must be controllable.
- STEP 02
Communication test on real hardware
Connect to the controllers and verify every address reads and writes. Addresses are validated as they are typed, with error messages straight from the driver.
- STEP 03
Build the site
Create devices and points, upload backgrounds and lay out the graphic screens, set alarm conditions and weekly schedules, then add interlocks where needed.
- STEP 04
Acceptance and training
Verify alarms fire, schedules run, control writes land, and the PLC falls back to local control on disconnect — then walk the on-site team through it.
- STEP 05
Operation and expansion
The whole site configuration exports as one package, so adding equipment or screens later never starts from scratch. Remote support and updates are agreed separately.
§ 09 · START THE ASSESSMENT
Three questions will tell you
whether this fits.
- CHK-01Which subsystems does this building have, and who installed each one?
- CHK-02Can you still find the point list for the Modbus devices?
- CHK-03Do you need to watch status, or to actually control?
- We prefer to ask the questions before quoting. A price given before the point count is settled is a price that will change.